A police station must work around the clock. That makes energy use an important part of its long-term operating cost. Through energy-efficient police station design, municipalities can reduce energy demand, lower utility expenses and maximize their investment in public safety infrastructure.
For the Village of Slinger’s new police station, the design team saw an opportunity to address that cost through practical design decisions.
Planning for Energy Efficiency in Police Facilities
Early in the project, the FGMA project team including the engineers with Ring & DuChateau worked with Wisconsin’s Focus on Energy New Construction Program to study how the building would use energy. The process helped the design team identify improvements that made sense for the station and gave the Village a way to evaluate their cost and benefit before construction was complete.

Energy-Efficient Design Strategies for Police Stations
The choices were woven into the facility’s design. Efficient lighting reduces electricity use across much of the station and its site. Improved wall and roof insulation helps limit heating and cooling demand. An efficient boiler and controls adjust building systems to how spaces are used. In the garage, ventilation controls respond to carbon monoxide levels.

How Much Can an Energy-Efficient Police Station Save?
Focus on Energy reviewed the completed construction drawings and submittals to verify the design. Its final model projects that the station will use 24% less energy than the baseline building and cost 28% less to operate annually—an estimated $12,874 in energy savings each year. The project also qualified for approximately $8,029 in Focus on Energy incentives. With that incentive, the additional investment in energy improvements has an estimated payback of 3.5 years.
These figures show projections; actual energy use will depend on how the station is operated. Still, the verified design shows what is possible when energy performance is considered alongside the daily needs of police personnel and the Village’s budget.
Maximizing Long-Term Municipal Investments Through Sustainable Design
This project reflects FGMA’s commitment to making sustainability part of everyday design decisions. By identifying practical ways to reduce energy use and operating costs, FGMA is helping Slinger make the most of its investment in a resource-efficient police station.
Slinger’s Police Station is a reminder that sustainability in public safety facilities does not have to begin with a sweeping mandate. It can start with a team asking how a public building can serve its community well today while using fewer resources for years to come.